Skip to content

Narrowing of the road infrastructure in Rothenburger Straße, Zirndorf.

Traffic authorities at Bayern's Central Traffic Management Centre have momentarily reduced the width of State Route 2245 (Rothenburger Straße) in the Leichling district of Zirndorf.

Narrowing of the road infrastructure in Rothenburger Straße, Zirndorf is underway
Narrowing of the road infrastructure in Rothenburger Straße, Zirndorf is underway

Narrowing of the road infrastructure in Rothenburger Straße, Zirndorf.

In the coming days, drivers in Zirndorf, Bavaria, can expect some changes on State Road 2245 (Rothenburger Street) due to construction work aimed at improving the road infrastructure. The Central Traffic Management Office of Bavaria has announced temporary lane narrowing in two distinct sections of the road.

The first section affected will be between Frauenschläger Street and Jordan Street, in the direction of Wintersdorf. Motorists should anticipate delays and plan their routes accordingly, as one lane of traffic will be closed during the construction period.

The second section affected will be between Zwickauer Street and Frauenschläger Street, in the direction of Nuremberg. Similarly, a lane will be closed in this section during the construction work.

The construction work will take place between 09:00 and 15:00 daily, starting on September 15, 2025, and is expected to last until September 26, 2025. During this period, the Central Traffic Management Office of Bavaria urges drivers to follow all traffic signs and speed limits for the safety of all road users.

Diversion routes will be clearly signposted for drivers during the construction period. The responsible party for the road construction work on the B 2245 in Zirndorf is typically the local road authority or the Bavarian State Ministry of Housing, Building and Transport. For specific contact information, drivers can reach out to the Zirndorf municipal administration.

The Central Traffic Management Office of Bavaria advises drivers to be patient and cautious during this construction period, and to expect delays. By working together, we can ensure a smooth and safe journey for everyone.

Read also: